Plotted on Mylar
Hand-Rendered on the back using Prismacolor Premiere Alcohol-based Markers
Total time from first plot to final render was about 20 hours.
Total cost for all materials and plotting is looking around $150.
Results? Pure. Awesome.
two images came out blurry. i will replace them with photographs from the drawings at the crit.
Site Plan
Floor Plans (Ground through 4th)
North South Elevations
East West Elevations
Sections (camera couldn't focus. will re-photograph eventually.)
Bodine Perspective
Courtyard Perspective (my favorite and it's bloody blurry!!!! stupid camera =[ )
No comments:
Post a Comment