Saturday, April 30, 2011

Design IV Final Project

Plotted on Mylar

Hand-Rendered on the back using Prismacolor Premiere Alcohol-based Markers

Total time from first plot to final render was about 20 hours.
Total cost for all materials and plotting is looking around $150.

Results? Pure. Awesome.

two images came out blurry. i will replace them with photographs from the drawings at the crit.




Site Plan




Floor Plans (Ground through 4th)




North South Elevations




East West Elevations




Sections (camera couldn't focus. will re-photograph eventually.)




Bodine Perspective




Courtyard Perspective (my favorite and it's bloody blurry!!!! stupid camera =[ )



No comments:

Post a Comment